Skip to content
Geye / Industry playbook

School

Observe site activity and occupancy patterns using purpose-limited zones and clear retention rules.

Planning guidance, not a claim of installed capabilities or customer results. Validate scope and feasibility before deployment.

Gate dutyTransition periodsAfter-hours access

Industry overview

School operations must balance arrival flow, safeguarding, and children’s privacy. Limit visual analysis to approved shared spaces and treat every signal as a prompt for authorized staff review.

Gate duty

Rain and umbrellas change visibility during pupil pickup.

Transition periods

Brief corridor surges coincide with scheduled lesson changes.

After-hours access

Authorized clubs and maintenance may use the same entrance.

Use cases

01

Gate duty

Context
Rain and umbrellas change visibility during pupil pickup.
Human action
Review arrival congestion at the main gate.
Intended outcome
A duty-teacher observation supporting the existing pickup plan.
Evaluate in a pilot
02

Transition periods

Context
Brief corridor surges coincide with scheduled lesson changes.
Human action
Observe shared-corridor occupancy during transitions.
Intended outcome
A shared-space review without individual behavior scores.
Evaluate in a pilot
03

After-hours access

Context
Authorized clubs and maintenance may use the same entrance.
Human action
Review activity at approved after-hours entrances.
Intended outcome
An entrance event checked against approved activities.
Evaluate in a pilot

AI vision capabilities

Evidence contract

Keep zone, source timestamp, and view availability together. A stale frame must not become a current event.

A person owns the decision

A duty-teacher observation supporting the existing pickup plan.

Define acceptance

Proposed capabilities must be tested against representative inputs. Unsupported or low-confidence results belong in a review queue, not an automatic decision.

Real-world scenario

Hypothetical, not a client story

Hypothetical: pickup traffic causes a crowded pedestrian gate. A duty teacher checks the scene and coordinates the existing pickup plan without identifying or scoring individual pupils.

  1. 01

    Context

    Rain and umbrellas change visibility during pupil pickup.

  2. 02

    Review trigger

    A candidate observation in the selected zone requires confirmation against current conditions.

  3. 03

    Human response

    Review arrival congestion at the main gate.

  4. 04

    Intended result

    A duty-teacher observation supporting the existing pickup plan.

How it works

  1. CCTV

    Read an authorized stream from the selected zone. Track source health and timestamps; a missing view is not an empty scene.

  2. AI analysis

    Apply validated models and zone rules on assessed compute. Group candidate events and expose uncertainty instead of implying certainty.

  3. Reviewed insight

    An assigned person checks evidence, records the outcome, and follows the existing operational procedure. Rejected signals feed back into evaluation.

Business and operational value

Review privacy impact, false-alert rate, and staff acceptance before expanding coverage.

01 / Evaluation metric

Evidence quality

Accepted observations / reviewed observations. Count missed cases separately against the manual reference.

Target: agree before pilot
02 / Evaluation metric

Review effort

Record minutes per reviewed item, including rework and escalations. Compare the same task with the manual baseline.

Target: agree before pilot
03 / Evaluation metric

Safe failure

Record whether stale inputs, denied access, and unavailable sources stop or visibly degrade the workflow.

Target: agree before pilot

Establish a manual baseline, agree acceptance thresholds with the operational owner, and compare review effort as well as accuracy. Any benefit must be measured in the pilot; no savings or ROI are promised here.

Deployment plan

Obtain safeguarding and privacy review before selecting a gate-only pilot. Inform the school community appropriately, validate arrival and dismissal samples, and appoint a trained duty reviewer.

  1. Scope: name the owner, permitted inputs, reviewers, and acceptance criteria.
  2. Prepare: assess edge, on-premises, or approved hybrid compute, storage, power, and network capacity with representative streams.
  3. Validate: compare with human-labelled samples, exercise denied access and outages, and document rejected results.
  4. Decide: approve a limited rollout only after review; keep a rollback owner and re-evaluate when inputs change.

Existing CCTV and infrastructure

Inspect gate visibility, seasonal sunlight, student-height coverage, and separation from learning systems. Mask nearby homes and exclude toilets, changing rooms, and private counselling spaces.

Compatibility review before sizing
CheckRequired evidence
Source accessAuthorized stream, codec, resolution, frame rate, recorder connection limit.
Scene qualityDay, night, occlusion, and missing-frame samples from the selected zone.
Compute & recoveryConcurrent decoding benchmark, storage budget, clock sync, outage fallback.

Existing CCTV may be reusable after compatibility assessment, not by default. Inventory codecs, resolution, frame rate, authorized stream protocols, recorder limits, time synchronization, and sample quality. Benchmark concurrent decoding and models before sizing hardware.

Integration planning

01

Approved source

02

Scoped processing

03

Human approval

04

Controlled export

Example: provide aggregate gate observations to the facilities duty log. Do not connect observations to pupil records, grades, or disciplinary systems.

These are example integration plans, not live connectors. Confirm schemas, least-privilege credentials, delivery acknowledgements, retry limits, and duplicate handling in a sandbox before enabling data exchange.

Security and privacy

Use the minimum data necessary for a specific safeguarding purpose. Restrict access to trained staff, set short justified retention, and prohibit automatic discipline or child profiling.

Least privilege

Approve reviewer roles and test a denied-access case before launch.

Data lifecycle

Set retention, deletion ownership, and encryption for stored and transmitted evidence.

Accountable operations

Log access and decisions; rehearse incident escalation and rollback.

Before launch, approve purpose and lawful access, role-based permissions, encryption configuration, retention and deletion rules, audit logging, and incident ownership. Verify these controls in the chosen environment; this page does not claim compliance certification.

Hypothetical pilot example

HYPOTHETICAL PILOT

One bounded question. Evidence before expansion.

Hypothetical pilot: duty staff tally gate congestion on ordinary and rainy dismissal days. Review umbrella-related misses and parent feedback before deciding whether the limited view should remain in use.

A proposed evaluation exercise, not a deployed case study. There are no named clients, claimed results, or implied endorsements.

Frequently asked questions

Is this an attendance system?

No. Anonymous gate counts cannot establish which pupil attended school.

Can classrooms be added by default?

No. A new purpose and safeguarding assessment are required; this pilot is limited to approved shared spaces.

Who can see clips?

Only explicitly authorized trained staff under a documented access and retention policy.

Plan your next step

Bring an authorized camera inventory, representative scenes, and one operational question. Prepare a planning brief, then validate sizing assumptions with a scoped pilot.